Sand berm construction for Al-Faw Project

KBC reward a contract to construct sand berms for Al-Faw project, the scope of work include preparation of the equipment and machines for excavation, cut, loading and transfer all others what is required to excavate and construction of sand.

Electrical, Plumbing & Sewage Network for Check Point In 2016

Kaser Al-Behar co. awarded contract to implement electrical, plumbing and sewage network installations for new 06 caravans at dog check point area at al-Faw. The scope of work is the construction of the utility networks (plumbing and sewage) and the installation of the A/C units, to the dog check point area as follow:
– Electrical network and installation of A/C for office porta cabins.
– Fully operational electrical network including the electrical panels and the connections with the generator and all port cabins.
– Fully operational sewage network including a 5 t. polyester sewage tank covered backfill materials.
– Fully operational plumbing network including the connections with the water tank and pump.

WhatsApp Image 2022-10-08 at 10.21.50 AM (11)
WhatsApp Image 2022-10-08 at 10.21.48 AM (1)
WhatsApp Image 2022-10-08 at 10.21.48 AM